Built Right the First Time

New Construction Plumbing in Louisville

You are building in Louisville, and every system you install now determines how your property performs for decades. A new construction plumbing system requires accurate planning, code-compliant layouts, and careful coordination with your building schedule. Morata Plumbing Service LLC provides full plumbing installation for residential and light commercial new construction projects across Louisville and surrounding areas.

This service includes water supply lines, drain-waste-vent systems, fixture rough-ins, and final connections for kitchens, bathrooms, laundry areas, and utility spaces. Experience dating back to 1997 ensures proper planning, layout, and long-term performance. The team works closely with builders and property owners to meet timelines and local code requirements while maintaining access points for future maintenance. Fully licensed and insured, every installation is owner-supervised from start to finish.

Contact Morata Plumbing Service LLC early in your build to schedule planning and installation in Louisville.

What Gets Installed and When It Happens


Your plumbing system installation happens in phases that align with your Louisville construction timeline. The rough-in phase includes placing supply lines, drain pipes, and vent stacks inside walls and under slabs before framing is closed. Pipe sizing, fixture placement, and cleanout locations are planned to meet current code and support your intended use.

Once walls are closed and finishes are applied, final fixtures are installed and tested. You will have working water pressure at every tap, proper drainage in every sink and toilet, and venting that prevents sewer gas from entering the building. All connections are pressure-tested to confirm no leaks exist before occupancy.

The system is designed for efficiency, durability, and future maintenance access. Materials are selected based on building type, water quality, and expected use patterns. If your project includes multiple bathrooms, a commercial kitchen, or outdoor water connections, those are incorporated into the layout from the beginning. Coordination with your builder or general contractor ensures plumbing work does not delay other trades.

Questions That Come Up During Planning

Every new construction project brings specific questions about layout, materials, and timing. These answers reflect what typically happens during plumbing installation in Louisville.

What happens during the rough-in phase?
Supply lines, drain pipes, and vent stacks are installed inside walls and under slabs before framing is closed. All pipe locations are marked and inspected to meet local code before the next construction phase begins.
How long does new construction plumbing take?
Timing depends on building size and complexity. A single-family home typically requires a few days for rough-in and another day for final fixture installation once finishes are in place.
What materials are used for supply and drain lines?
You will typically see PEX or copper for supply lines and PVC or ABS for drain and vent lines. Material choice depends on code requirements, building type, and water quality in your Louisville area.
When should plumbing be scheduled in the build?
Rough-in plumbing happens after the foundation is poured and before walls are closed. Final fixture installation occurs after drywall, flooring, and paint are complete.
What gets inspected before walls close?
All rough-in plumbing is inspected by local code officials before framing is closed. This includes pipe sizing, vent routing, drain slope, and pressure testing to confirm no leaks exist.

Morata Plumbing Service LLC coordinates with your builder to keep your Louisville project on schedule and compliant with local requirements. Get in touch to discuss your new construction plumbing needs and timeline.